Laboratory
The Laboratory is housed at the Rock Creek Wastewater Treatment Facility, 9600 Norledge,
Independence, Missouri.
It is operated by a staff of three and is equipped to perform testing and analysis
required for the treatment facility’s process control and field sampling analyses.
Over 2,500 separate tests each month are performed. The laboratory ensures all testing
required for the wastewater treatment plant’s NPDES (National Pollutant Discharge
Elimination System) Permit is completed. The
Missouri Department of Natural Resources
is the authority for the NPDES permit program.
 |
A Clear Commitment to
Clean Water |